Bobcat Hydraulic Excavator 130 Service Manual 6570485
Original price was: 40 $.30 $Current price is: 30 $.
- Brand: Bobcat
- Model: Hydraulic Excavator 130
- Type Of Manual: Service Manual
- Manual ID: 6570485
- Format: PDF
- Size: 6.6MB
- NumPage: 222
Description
CONTENTS
STANDARD TIGHTENING TORQUE
– STANDARD TIGHTENING TORQUE OF BOLTS AND NUTS
– TIGHTENING TORQUE OF SPLIT FLANGE BOLTS
– TIGHTENING TORQUE FOR NUTS AND FLARED
COATING MATERIALS
ELECTRIC WIRE CODE
– CLASSIFICATION BY THICKNESS
– CLASSIFICATION BY COLOR AND CODE
ENGINE STRUCTURE AND FUNCTION
– ENGINE MOUNT
– RADIATOR
– FUEL TANK AND PIPING
– ENGINE CONTROL
ENGINE TESTING AND ADJUSTING
– TESTING AND ADJUSTING DATA
– TOOL LIST FOR TESTING AND ADJUSTING
– ADJUSTING VALVE CLEARANCE
– MEASURING COMPRESSION PRESSURE
– ADJUSTING FUEL INJECTION TIMING
– TESTING AND ADJUSTING FAN BELT TENSION
– ADJUSTING FUEL CONTROL LEVER
ENGINE DISASSEMBLY AND ASSEMBLY
– REMOVAL OF STARTING MOTOR ASSEMBLY
– INSTALLATION OF STARTING MOTOR ASSEMBLY
– REMOVAL OF ALTERNATOR ASSEMBLY
– INSTALLATION OF ALTERNATOR ASSEMBLY
– REMOVAL OF FUEL INJECTION ASSEMBLY
– INSTALLATION OF FUEL INJECTION ASSEMBLY
– REMOVAL OF ENGINE OIL COOLER ASSEMBLY
– INSTALLATION OF ENGINE OIL COOLER ASSEMBLY
– REMOVAL OF FAN AND FAN PULLEY ASSEMBLY
– INSTALLATION OF FAN AND FAN PULLEY ASSEMBLY
– REMOVAL OF WATER PUMP ASSEMBLY
– INSTALLATION OF WATER PUMP ASSEMBLY
– REMOVAL OF THERMOSTAT ASSEMBLY
– INSTALLATION OF THERMOSTAT ASSEMBLY
– REMOVAL OF NOZZLE HOLDER ASSEMBLY
– INSTALLATION OF NOZZLE HOLDER ASSEMBLY
– REMOVAL OF CYLINDER HEAD ASSEMBLY
– INSTALLATION OF CYLINDER HEAD ASSEMBLY
– REMOVAL OF HYDRAULIC OIL COOLER ASSEMBLY
– INSTALLATION OF HYDRAULIC OIL COOLER ASSEMBLY
– REMOVAL OF RADIATOR AND HYDRAULIC OIL COOLER ASSEMBLY
– INSTALLATION OF RADIATOR AND HYDRAULIC OIL COOLER ASSEMBLY
– REMOVAL OF ENGINE ASSEMBLY
– INSTALLATION OF ENGINE ASSEMBLY
– REMOVAL OF PTO ASSEMBLY
– INSTALLATION OF PTO ASSEMBLY
– DISASSEMBLY OF PTO ASSEMBLY
– ASSEMBLY OF PTO ASSEMBLY
POWER TRAIN STRUCTURE AND FUNCTION
– POWER TRAIN
– TRAVEL SYSTEM
– TRAVEL CONTROL CIRCUIT SCHEMATICS
– TRAVEL CONTROL CIRCUIT
– TRAVEL MOTOR
– CENTER SWIVEL JOINT
– STRAIGHT TRAVEL SYSTEM
– TRAVEL CONTROL
– SWING SYSTEM
– SWING CONTROL CIRCUIT SCHEMATICS
– SWING CONTROL CIRCUIT
– SWING MOTOR AND BRAKE VALVE
– SWING PRIORITY CIRCUIT
– SWING PRIORITY VALVE
– SWING MACHINERY
– SWING CIRCLE
– SPROCKET
POWER TRAIN DISASSEMBLY AND ASSEMBLY
– REMOVAL OF CENTER SWIVEL JOINT ASSEMBLY
– INSTALLATION OF CENTER SWIVEL JOINT ASSEMBLY
– DISASSEMBLY OF CENTER SWIVEL JOINT
– ASSEMBLY OF CENTER SWIVEL JOINT
– REMOVAL OF TRAVEL MOTOR UNIT
– INSTALLATION OF TRAVEL MOTOR UNIT
– REMOVAL OF SWING MOTOR
– INSTALLATION OF SWING MOTOR
– REMOVAL OF SWING CIRCLE ASSEMBLY
– INSTALLATION OF SWING CIRCLE ASSEMBLY
– REMOVAL OF SWING MACHINERY ASSEMBLY
– INSTALLATION OF SWING MACHINERY ASSEMBLY
– REMOVAL OF SPROCKET ASSEMBLY
– INSTALLATION OF SPROCKET ASSEMBLY
POWER TRAIN MAINTENANCE STANDARD
– SWING MACHINERY
– SWING CIRCLE
– SWING MOTOR
– SPROCKET
UNDERCARRIAGE STRUCTURE AND FUNCTION
– TRACK FRAME
– IDLER
– RECOIL SPRING
– TRACK ROLLER
– CARRIER ROLLER
– TRACK SHOE
UNDERCARRIAGE DISASSEMBLY AND ASSEMBLY
– REMOVAL OF RECOIL SPRING
– INSTALLATION OF RECOIL SPRING
– DISASSEMBLY OF RECOIL SPRING
– ASSEMBLY OF RECOIL SPRING
– REMOVAL OF TRACK ROLLER ASSEMBLY
– INSTALLATION OF TRACK ROLLER ASSEMBLY
– REMOVAL OF CARRIER ROLLER ASSEMBLY
– INSTALLATION OF CARRIER ROLLER ASSEMBLY
– REMOVAL OF TRACK SHOE ASSEMBLY
– INSTALLATION OF TRACK SHOE ASSEMBLY
UNDERCARRIAGE MAINTENANCE STANDARD
– TRACK FRAME AND RECOIL SPRING
– IDLER
– CARRIER ROLLER
– TRACK ROLLER
– TRACK SHOE
HYDRAULIC SYSTEM STRUCTURE AND FUNCTION
– HYDRAULIC PIPING
– HYDRAULIC SCHEMATICS
– HYDRAULIC CIRCUIT
– HYDRAULIC TANK
– HYDRAULIC PUMP
– PRESSURE COMPENSATING CONTROL SYSTEM
– CONTROL VALVE
– HYDRAULIC CYLINDER
– SPECIFIATIONS
– WORK EQUIPMENT CONTROL
– WORK EQUIPMENT
HYDRAULIC SYSTEM TESTING AND ADJUSTING
– TABLE OF STANDARD VALUES
– MEASURING HYDRAULIC OIL TEMPERATURE
– TESTING OPERATING FORCE OF CONTROL LEVERS
– TESTING TRAVEL OF CONTROL LEVERS
– TESTING TRAVEL OF CONTROL VALVE SPOOLS
– TESTING AND ADJUSTING MAIN RELIEF VALVE
– TESTING AND ADJUSTING CHARGING PUMP RELIEF VALVE
– MEASURING DELIVERY OF PISTON PUMP
– CHECKING PERFORMANCE OF WORK EQUIPMENT
– AIR BLEEDING
– CHECKING TRAVEL MOTOR PERFORMANCE
– CHECKING PERFORMANCE OF SWING MOTORS
– MEASURING OIL LEAKAGE FROM SWING AND TRAVEL MOTORS
– MEASURING OIL LEAKAGE FROM CENTER SWIVEL JOINT
– CHECKING VISUALLY OR BY FEEL
– TROUBLESHOOTING
HYDRAULIC SYSTEM DISASSEMBLY AND ASSEMBLY
– REMOVAL OF CONTROL PUMP ASSEMBLY
– INSTALLATION OF CONTROL PUMP ASSEMBLY
– REMOVAL OF MAIN PUMP ASSEMBLY
– INSTALLTION OF MAIN PUMP ASSEMBLY
– REMOVAL OF L.H. 6SPOOL CONTROL VALVE ASSEMBLY
– INSTALLATION OF L.H. 6SPOOL CONTROL VALVE ASSEMBLY
– REMOVAL OF R.H. 5SPOOL CONTROL VALVE ASSEMBLY
– INSTALLATION OF R.H. 5SPOOL CONTROL VALVE ASSEMBLY
– DISASSEMBLY OF CONTROL VALVE ASSEMBLY
– ASSEMBLY OF CONTROL VALVE
– REMOVAL OF BOOM CYLINDER ASSEMBLY
– INSTALLATION OF BOOM CYLINDER ASSEMBLY
– REMOVAL OF ARM CYLINDER ASSEMBLY
– INSTALLATION OF ARM CYLINDER ASSEMBLY
– REMOVAL OF BUCKET CYLINDER ASSEMBLY
– INSTALLATION OF BUCKET CYLINDER ASSEMBLY
– DISASSEMBLY OF HYDRAULIC CYLINDER ASSEMBLY
– ASSEMBLY OF HYDRAULIC CYLINDER
HYDRAULIC SYSTEM MAINTENANCE STANDARD
– CHARGING PUMP
– L.H. 6SPOOL CONTROL VALVE
– R.H. 6SPOOL CONTROL VALVE
– HYDRAULIC CYLINDER
– WORK EQUIPMENT
WORK EQUIPMENT DISASSEMBLY AND ASSEMBLY
– REMOVAL OF WORK EQUIPMENT ASSEMBLY
– INSTALLATION OF WORK EQUIPMENT ASSEMBLY
– DISASSEMBLY OF BUCKET
– ASSEMBLY OF BUCKET
– REMOVAL OF ARM ASSEMBLY
– INSTALLATION OF ARM ASSEMBLY
– REMOVAL OF BOOM ASSEMBLY
– INSTALLATION OF BOOM ASSEMBLY
– REMOVAL OF ARM, BUCKET ASSEMBLY
– INSTALLATION OF ARM, BUCKET ASSEMBLY
ELECTRICAL SYSTEM STRUCTURE AND FUNCTION
– ELECTRICAL SYSTEM
– ELECTRICAL CIRCUIT DIAGRAM
SERVICE MANUAL REVISION
– 1301
Reviews
There are no reviews yet.